
Emergency Temporary Heating, Hot Water and Cooling Solutions
Loss of heating, hot water or cooling systems can bring operations to an immediate halt. In certain environments — including healthcare, commercial offices, industrial facilities and residential blocks — system failure can create serious health, safety and compliance risks.
At Calcon, we provide rapid-response temporary heating, hot water and cooling solutions designed to maintain operational continuity during system failure, planned shutdowns or refurbishment works.
Our Facilities Management-led approach ensures emergency provisions are implemented safely, efficiently and with minimal disruption to building occupants.
Temporary Heating & How Water Systems
Where primary plant fails or requires replacement, we provide temporary systems to bridge the gap and prevent downtime.
Solutions include:
-
Temporary boiler plant
-
Packaged heating systems
-
Temporary hot water generation
-
Plant room bypass solutions
-
Fuel management and distribution
Systems are sized and configured to meet the operational demands of the building, ensuring continuity of service while permanent repairs or upgrades are undertaken.
Emergency Cooling & AC Support
Cooling failure can affect staff welfare, critical equipment and regulatory compliance — particularly in IT environments, healthcare settings and temperature-sensitive operations.
We provide:
-
Temporary chiller units
-
Portable air conditioning systems
-
Emergency ventilation support
-
Rapid installation and commissioning
-
Ongoing monitoring during deployment
-
Our team ensures systems are installed safely and efficiently, restoring environmental control without unnecessary operational interruption.
Bespoke Emergency Preparedness
True resilience is built before failure occurs.
We work with clients to develop structured contingency planning, including:
-
Risk assessments of critical plant
-
Identification of high-risk assets
-
Temporary system capacity planning
-
Access and connection point preparation
-
Documented emergency response procedures
By pre-planning emergency provisions, downtime can be significantly reduced and operational impact minimised.
Compliance & Risk Management
Under UK health and safety legislation, duty holders must ensure that building services do not create risk to occupants.
Loss of heating, cooling or hot water can impact:
-
Workplace safety and welfare (Workplace Health, Safety and Welfare Regulations)
-
Legionella control in water systems
-
Fire safety systems
-
Business continuity obligations
-
Contractual service level agreements
-
Our emergency solutions are deployed with full risk assessment, method statements and compliance oversight, ensuring legal obligations are maintained even during system failure.
Planned vs Reactive Resilience
A purely reactive approach to plant failure increases downtime, financial loss and reputational risk.
Our Facilities Management model incorporates:
-
Critical asset identification
-
Lifecycle monitoring
-
Contingency planning
-
Rapid mobilisation capability
-
Strategic capital replacement planning
This ensures emergency response becomes part of a broader resilience strategy rather than an isolated last-minute solution.
Why Choose Calcon
-
Rapid mobilisation capability
-
Fully managed temporary plant solutions
-
Compliance-led emergency response
-
Integrated FM coordination
-
Minimal operational disruption
We do not simply deliver temporary equipment — we provide structured continuity solutions that protect your people, assets and operations.
%20(1).jpg)